• Inspection

    The first step taken by our test and tag team is a visual inspection to identify any damaged or missing components.
  • Testing

    The visual inspection is followed by thorough testing of earth continuity, voltage leakage, insulation resistance and polarity, which cannot be seen by the naked eye
  • Test Result

    The tests will reveal a pass or fail result for the item being tested. If the result is a fail the item will need to be removed from service and repaired or replaced.
  • Tagging

    The results of the test, along with the date and time the test was conducted, will be placed on a tag and attached to the item. There will also be a date on the tag for the next time the test should be conducted. This date can be at 3, 6, 12 or 24 month intervals depending on the item being tested.
  • Detailed Report

    A detailed report will be issued which will include the results of each electrical item that was tested.